Team reviewing a completed procurement report together
What to Expect

What Your Procurement Report Looks Like

At the end of the process you receive one professionally structured report: every bid, every design, every score, and a clear recommendation. From racking to forklifts and MHE, we leave no stone unturned. Here's what's inside.

The Deliverable

One Report. Every Answer.

Instead of a folder of mismatched quotes, you receive a single, coherent document that makes your decision straightforward and easy to justify to stakeholders. We leave no stone unturned: every racking configuration and every forklift or MHE option is priced, scored and compared side by side. Below is a preview of each section, walkthrough of what you'll actually receive.

01

Executive Summary

Project overview, key requirements, and how many suppliers were invited and responded — the whole picture in one page.

02

Site & Operational Analysis

Warehouse dimensions, current operation, throughput data and detailed storage requirements — the factual foundation for every bid.

03

CAD Design Options

Two to three fully annotated layout options, so you can see exactly how each configuration uses your space.

04

Racking Tender Example

A single table comparing every racking supplier on price, lead time, warranty, spares availability, local support and SEMA compliance — like for like, with nothing left unchecked. This is exactly the kind of comparison that goes into your report for pallet racking, drive-in, push-back or shelving projects.

SupplierPriceLead TimeWarrantySparesLocal SupportCompliance
Supplier A£248,00010 wks2 yrsYesYesSEMA
Supplier B£231,5008 wks2 yrsYesYesSEMA
Supplier C£262,9007 wks2 yrsNoNoSEMA
Supplier D£255,40012 wks2 yrsNoYesPartial
Supplier E£244,1009 wks2 yrsYesNoSEMA
Supplier F£239,80011 wks2 yrsYesYesSEMA

Figures shown are illustrative examples to demonstrate the report format. They are not results from a specific project and should not be read as current market pricing.

05

Forklift / MHE Tender Example

The same scrutiny applies to forklifts and materials handling equipment. This is a big part of what sets Stratos apart — trucks are compared on more than headline price, including standby/relief truck (STR) cover, first time fix rate, local engineer coverage and response time, so nothing is missed.

SupplierTruck TypePrice / LeaseLead TimeSTR CoverFirst Time FixLocal EngineersResponse Time
Supplier A2.5t Counterbalance (Electric)£34,50021 wksYes88%4Up to 4 hrs
Supplier B2.5t Counterbalance (Electric)£31,20019 wksYes94%7Up to 4 hrs
Supplier C2.5t Counterbalance (Electric)£36,80022 wksNo79%2Up to 8 hrs
Supplier D2.5t Counterbalance (Li-ion)£39,90020 wksYes85%3Up to 4 hrs
Supplier E2.5t Counterbalance (Electric)£33,70018 wksYes91%5Up to 4 hrs
Supplier F2.5t Counterbalance (Li-ion)£37,25023 wksNo82%3Up to 8 hrs

Figures shown are illustrative examples to demonstrate the report format. They are not results from a specific project and should not be read as current market pricing.

06

Detailed Scoring Matrix

Weighted scoring of each bid against your defined criteria. Below: the top-ranked supplier's weighted result.

Price (30%)
92
Lead Time (20%)
88
Compliance (20%)
100
Quality (20%)
85
After-Sales (10%)
90
07

Recommendation

Stratos' independent recommendation with clear rationale — the best-value compliant option, and exactly why it wins on your criteria.

08

Next Steps

A practical route to proceed with the chosen supplier — contracting, scheduling and how our project coordination keeps it on track.

Scope of Work

What Can We Tender?

From single racking installations to full warehouse fit-outs, we manage tenders across the full range of warehouse equipment.

  • Pallet Racking Installation Projects
  • Forklift / MHE Fleets
  • Mezzanine Floor Installations
  • Shelving & Small Parts Storage
  • Drive-In & Push-Back Racking Systems
  • Racking Removal & Reconfiguration
  • Warehouse Automation & Conveyor Systems
  • Full Warehouse Fit-Outs